Công ty TNHH Thương mại Thái Sơn Nam > Company News > LS Cable Bus Way Launching Ceremony
  • 25Mar
    2009
    LS Cable Bus Way Launching Ceremony
    LS Cable Bus Way Launching Ceremony

    LS Cable Bus Way Launching Ceremony was organized on the 25th of March, 2009 at Horizon Hotel Hanoi. More than one hundred representatives of the companies which operate  in Consultants, Constructions have joined the Ceremony.

    After the speech of Mr. Bui Dinh Te – Thai Son Bac Director , the  attendants listened to Mr. Tea Won Son – Deputy General Manager  from LS Cable. In brief, Mr. Tea Won Son introduced  LS Cable, LS Group and the achievements that LS Cable gained with Bus Way. The most important point of the Ceremony is that Mr. Tea Won Son emphasized the technical informations of the Bus Way as compared with that of competitors’ product.

    From the left, Mr.Bui Dinh Te - Thai Son Bac Director , Mr. Nguyen Hong Hai - Thai Son Nam Director, Mr. Seon Kook Kim - LS Vina Cable General Director, Mr. Nguyen Hong Son - Duc Viet Director, standing Mr. Tea Won Son - LS Cable Deputy General Manager

    From the left, Mr.Bui Dinh Te – Thai Son Bac Director , Mr. Nguyen Hong Hai – Thai Son Nam Director, Mr. Seon Kook Kim – LS Vina Cable General Director, Mr. Nguyen Hong Son – Duc Viet Director, standing Mr. Tea Won Son – LS Cable Deputy General Manager

    Mr.Tea Won Son ended his speech with the notification that Thai Son Bac anh Thai Son Nam had been appointed as Bus Way Authorized Importer and Distributor in Vietnam.

    DSCN0973

     

    Seeing the advantages of Bus Way, most of the attendants raised their interest in the price of LS Cable Bus Way in Vietnam.

     The attendants saw the sample Bus Way in the Ceremony

    The attendants saw the sample Bus Way in the Ceremony

    After the break, the attendants kept on making questions about Bus Way. One of the attendants asked : “ What kind of project do we use for Bus Way? ” – “ We can use Bus Way for high – rise building or factory plant to use the power from 1000A ” answered Mr.Lai Duc Phuong – Deputy Director of Thai Son Bac. Then he continued: “ In this case, the project using Bus Way will be more economical than that using power cable ”.

    Plug in Box

    Another asked: “ How does Bus Way distribute main line to each lot? ” – “ We can use Plug in Box at the position where we want to get power from the main line, Plug in Hole will be made within Bus Way. We plug the Plug in Box in that hole. In Plug in Box, we can install MCCB ” answered Mr. Phuong.

    The Ceremony has ended with prospect of a successful future.

    TSB